Building Enclosure Blunder in the Basement

3 Comments Read/write comments

sealed combustion closet unsealed floor joist duct

The photo below shows a common problem in new homes. It's also one that can make it difficult to pass the blower door test required by many building codes these days. If I tell you that the wall pictured here separates two rooms in a basement and one of them is not conditioned, can you see the problem? If so, how many mistakes do you see here?

The building enclosure is the boundary between inside and outside. It separates conditioned space from various types of unconditioned space. In the case of the wall above, it separates the conditioned part of a basement from a mechanical room with three atmospheric combustion appliances - two 80 AFUE furnaces and a natural draft water heater, all of which burn natural gas.

Since atmospheric combustion appliances draw their combustion air from the room they're in, they need an adequate supply of air. The room behind that wall has a 12" duct that will bring combustion air from the outdoors directly into that room.

Ignoring the grade III fiberglass insulation in the wall, the air barrier problems are in the joist area above the wall. They are:

  • Open-web floor trusses with no blocking. Air can go right through those openings in the trusses.
  • Flex ducts running through the joists. It's impossible to get a good, durable seal around flex duct because it moves.
  • No blocking or sealing across the top of the wall. That bit of fiberglass below the pipes is a pathetic attempt to stop air movement that won't work.

The way this part of the building enclosure is constructed is pretty near impossible to fix after the fact, especially with flex duct running through the joists. What would have worked is to put in a rigid air barrier before running the ducts or plumbing and telling every trade contractor who cuts a hole to make sure they seal it.

And the HVAC contractor would need to do more than just cut a hole and run the flex straight through. The movement of the flex would eventually defeat the air sealing, so they'd need to install a rigid connector through the rigid air barrier and connect the flex to either side of it.

As this home has been built, the mechanical room on the other side is not going to have a hope of being the "sealed combustion closet" it needs to be.

 

Related Articles

I-Joists, Attached Garages, and the Air Leaks That Poison

The 3 Rules of Air Sealing

Air Barriers, Vapor Barriers, and Drainage Planes Do Different Jobs

 

NOTE: Comments are moderated. Your comment will not appear below until approved.

Comments

Tim Donovan

New home. So where was the ball dropped? And by whom? Builder? most definitely. Code official? Just as guilty. Trades? if you've ever been in contract negotiations with builders, I wouldn't be blaming the trades....So is the solution better educated code officials?

leo kloop

I cannot tell you how many homes in Atlanta area are built just like this. Inspectors let the stuffed fiberglass slide for proper blocking. Living space over garage is a tough one if you need HVAC and Plumbing runs in the room(s)above. Here in GA, we raaaaarley ever see house plans that have any details whatsoever. I am looking at really centralizing the placement of HVAC and H2O heat to minimize on the envelope penetrations and using interstitial spaces more efficiently (luckily, I build modern-style homes).

Eric Griffin

What about the problem with ACH50 as a metric for air tightness. There's a lot more room for error in larger homes.